2026-11-27

A battery-pack manufacturer in China was preparing a European EV platform and found itself coordinating three material suppliers across two provinces. The pack needed flame-retardant PC/ABS for the enclosure, polyimide film for cell and busbar insulation, and TPU for cable jacketing. Each supplier used a different COA format, and two had no UL yellow card on file.
The pack had to meet UL 94 V-0 at 1.5 mm, a 150 °C short-term thermal excursion, CTI above 600 V, and REACH/RoHS declarations for the EU market. The customer's own assembly schedule allowed only five working days between material arrival and pack build. With three separate suppliers, incoming inspection alone took four days.
We proposed a single qualified package rather than three independent quotations:
| Function | Material | Key requirement |
|---|---|---|
| Pack enclosure and covers | FR PC/ABS | UL 94 V-0 at 1.5 mm, CTI >600 V, impact strength |
| Cell and busbar insulation | PI film, 25–50 μm | Dielectric strength, 150 °C continuous, low outgassing |
| Cable jacket and strain relief | FR TPU | Halogen-free flame retardancy, flexibility, abrasion resistance |
All three materials were supplied with batch COAs, UL yellow cards and REACH/RoHS declarations in one document pack. The PC/ABS grade was selected for its balance of flame retardancy and impact strength; the PI film for its dielectric strength above 100 kV/mm; the TPU for halogen-free FR performance and flex life in cable routing.
We consolidated the three materials into one monthly 40-foot container from Shenzhen. Each pallet was labelled by pack station, not by supplier, so the customer's line could pull material directly without sorting. A single document folder covered all three families, with batch numbers cross-referenced to the pack serial range.
The customer ran a 300-hour pack-level validation covering thermal cycling, vibration and dielectric withstand. All three materials passed without substitution or re-test.
Battery-pack projects rarely fail because one resin is wrong. They fail because three correct materials arrive with three incompatible document sets and no batch traceability. By qualifying the package together and shipping it as one lot, we removed the coordination cost that sits between the material and the pack.